- SV Partners
Located in a heritage building, works involved new partitioned offices, specialist joinery, concealed sliding doors, operable wall systems, designer lighting and a concealed project screen. Open plan workstation areas and breakout areas are a fe ...
Project Gallery - admin - 19/11/2008 - 10:25 - 0 attachments
- Sedgman
Over three levels within an existing building, the project involved extensive detailing to the ceilings, lighting, joinery and flooring. Numerous glass front offices with solid sliding doors as well as the installation of 150 workstations, kitch ...
Project Gallery - admin - 05/02/2010 - 14:08 - 0 attachments
- Maunsell Bassett
Over three levels, the fitout comprised of a public floor with client reception, meeting facilities and two large boardrooms. The additional two floors were identical in layout except for subtle differences in colour and materials. An interconne ...
Project Gallery - admin - 19/11/2008 - 10:33 - 0 attachments
- Cleveland North Mall
This project involved the erection of a roof over the open aired Stockland Shopping Mall. The mall remained fully operational and opened to the public during trading hours, with the works completed at night. ...
Project Gallery - admin - 19/11/2008 - 15:20 - 0 attachments
- Wesley Hospital
Work was carried out over three floors including medical consulting suites, extension to ward, construction of new research laboratory with existing basement car park and internal stairs connecting levels. ...